Our Marine services included: Pile Driving, Marinas & Breakwaters, Land Reclamation, Dredging, Ship Repairs, Navigation Marks & Towers and Towing & Salvage

Construction of Bermuda's largest Super Yacht Marina. This project was completed just in time for the 35th America's Cup. It will serve as the official marina for the Ritz Carlton at Caroline Bay.

The dock is made up of  a 458' x 721' concrete breakwater on the outside and aluminum floating docks on the inside. All docks are anchored with piles supplied and driven by Correia Construction.


Construction of new marina. One of numerous projects that commenced phase 1 upgrades for the Hamilton Princess Hotel. Works consisted of pile driving, setting precast pile caps and slabs, installation of Floating dock system and construction of a lighthouse structure.

Correia Construction were selected by Jay Cashman Inc. as subcontractors for this project. This area of reclaimed land will be the home of the Event Village for the 2017 America's Cup. The works included relocation of approximately 140,000 cubic yards of previously dredged material, relocation of approximately 300,000 cubic yards of fill material imported from Canada, construction of 1,200 foot splash wall and installation of the sheet pile bulkhead.

Demolition of existing hardstand and removal of existing conflicting piles. Driving of new piles and construction of precast slab sections to create new and larger hardstand area. We also refurbished 100 concrete piles on the existing North Arm. Work consisted of placing fiberglass jackets around existing pies and grouting from the sea bead up to the underside of the North Arm. 



Construction of a new mega cruise ship dock for the Bermuda Government. Construction works consisted of a new Ground Transportation Area on reclaimed land, construction of the main dock which is supported by 174 piles, construction of mooring and breasting dolphins, cat walk and Terminal Building.