Construction of Bermuda's largest Super Yacht Marina. This project was completed just in time for the 35th America's Cup. It will serve as the official marina for the Ritz Carlton at Caroline Bay.

The dock is made up of  a 458' x 721' concrete breakwater on the outside and aluminum floating docks on the inside. All docks are anchored with piles supplied and driven by Correia Construction.